Installation & Commissioning
Once a machine or piece of equipment has been developed and designed, the time-consuming phase of installation and startup begins. Here the individual components need to be electrically connected to each other. This is followed by adjustment and parameter setting.
By using IO-Link this effort is significantly reduced. In addition, the number of different parts and error frequency will be drastically reduced. This is achieved through
- Simplification of the cabling through standardization, and
- The ability to automate startup through parameter data storage and duplication
This applies equally to all kinds of sensors and actuators. Here are a few practical examples:
Reduce assembly time
Example of a packaging system, equipped with a complex device such as a color sensor
previously | with IO-Link |
---|---|
|
|
Startup
Example of a paint robot, equipped with multiple pressure sensors
previously | with IO-Link |
---|---|
|
|